Compare and switch
Business ElectricityCompare supplier pricing for your metersBusiness GasFixed and flexible gas contracts explainedBusiness WaterRetailer switching and water cost reviewsBusiness EnergyElectricity and gas managed together
Installations and projects
Business Meter InstallationNew connections, upgrades and smart metersCommercial Solar PanelsRooftop solar for business premisesEnergy BrokersHow brokers work and what we do
Not sure where to start? A comparison covers everything in one go.
Business electricity for manufacturing and industrial
We help UK manufacturers review electricity contracts across process loads, half-hourly metering, capacity charges and Climate Change Agreement eligibility.
Last updated .
Specialist electricity support for UK manufacturers
A mid-sized food manufacturer we work with operates 24/7 across three production lines. Their electricity bill ran to seven figures annually, half-hourly settled, with capacity charges, reactive power adjustments and a flex contract that nobody on the finance team fully understood. The first useful piece of work was just translating the bill into plain English so the FD could see what was paying for what.
Manufacturing electricity is a different conversation from any standard SME. Process motors, compressed air systems, refrigeration, lighting, HVAC. Each line has its own profile. Most sites are half-hourly settled with KVA capacity charges. Many qualify for Climate Change Agreements with associated CCL discount. Contract types are rarely simple fixed terms.
This page covers how we help UK manufacturers review their electricity contracts. The mechanics of switching are in our business electricity switching guide. Our business electricity service covers the open UK market across every commercial sector.
How we help manufacturing operators
We start by translating the bill. For half-hourly settled sites the invoice contains a lot of moving parts: unit rates by time of day, DUoS (Distribution Use of System) charges, TUoS (Transmission Use of System) charges, capacity charges, reactive power, Climate Change Levy, and possibly a contract management fee.
From there we look at whether the contract type (fixed, flex, pass-through, basket-tracking) suits the operation, whether the available capacity matches actual peak demand, and whether CCA registration is in place where the sector qualifies.
Why manufacturing electricity bills are different
| Feature | Standard SME | Manufacturing site |
|---|---|---|
| Settlement | Profile (non-half-hourly) | Half-hourly, often three-rate (day/night/evening-weekend) |
| Capacity charges | None | KVA charge based on agreed capacity |
| Reactive power | None | Charged where power factor is below threshold |
| Contract type | Fixed | Often flex, pass-through, or basket-tracking |
| CCL | Standard rate | Discount available with Climate Change Agreement |
| Renewables | Optional | Often required for ESG reporting, REGO-backed supply |
Half-hourly settlement and capacity charges
For manufacturing sites the agreed import capacity (KVA) is a fixed monthly charge regardless of consumption. Capacity set higher than actual peak demand costs every month. Capacity set lower than peak demand triggers excess charges. Reviewing the historical demand profile against the agreed capacity is one of the easier wins on a manufacturing electricity review.
Climate Change Agreements and CCL discount
Energy-intensive sectors qualify for Climate Change Agreements (CCAs) administered via trade associations. CCA participants get a discount on Climate Change Levy in exchange for meeting agreed energy efficiency targets. We don’t manage CCAs but we’ll flag where your sector qualifies and the discount isn’t being applied on the bill.
Contract type: fixed, flex or pass-through
For manufacturers, the right contract type depends on operational risk appetite. Fixed-term contracts give predictability but you pay for the supplier’s risk margin. Flex contracts let you hedge purchase volumes across the wholesale market. Lower margin but requires active management. Pass-through contracts separate energy cost from non-energy charges, giving more visibility on the breakdown.
How a manufacturing electricity review works
| Step | What happens |
|---|---|
| Bill audit and MPAN check | Half-hourly data pulled, contract terms reviewed, capacity vs demand assessed. |
| Capacity and reactive power review | We flag oversized capacity and reactive power charges where power factor correction would help. |
| Market quote, contract type comparison | Fixed, flex and pass-through proposals from licensed suppliers, on a like-for-like basis. |
| Switch and ongoing management | Switches complete in six to ten weeks for HH sites. No supply interruption. |
A similar case study
This case study comes from the same sector. It covers water rather than electricity, but the way we work is the same.
Common questions
Can a manufacturer switch electricity supplier?
Yes. Any UK commercial or industrial site can switch electricity supplier. Half-hourly settled sites take six to ten weeks to complete a switch; non-HH sites complete in four to eight.
What is a Climate Change Agreement and do we qualify?
CCAs are administered through trade associations for energy-intensive sectors. Participants receive a CCL discount in exchange for meeting agreed energy efficiency targets. Eligibility is set by sector. We will flag where your operation likely qualifies and the discount should appear on the bill.
What is reactive power and why are we being charged for it?
Reactive power is the part of the electrical load that does not perform useful work but loads the network. Where power factor falls below a threshold (typically 0.95), the DNO charges for the excess. Power factor correction equipment can eliminate the charge. We will flag where it appears on the bill.
Should we be on a fixed, flex or pass-through contract?
It depends on operational risk appetite, volume predictability and finance team capacity. Fixed gives certainty at a margin cost. Flex gives lower margin but requires active management. Pass-through separates energy and non-energy components for visibility. We will model each against your profile.
How long does a manufacturing electricity review take?
The bill audit and contract review takes two to three weeks for a typical site. Switches complete in six to ten weeks for HH-settled sites.
Half-hourly settlement, capacity audit, contract type review. We work through every line on the bill.

